Construction Site Access: Difference between revisions

From X-Fusion Wiki
Jump to navigationJump to search
No edit summary
m Text replacement - "AQA Security Room" to "AQA Security Room North"
 
(6 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{Adjacent rooms
{{Adjacent rooms
| northwest = [[AQA Room 79900]] (South East)
| northwest = [[Construction Site]] (South East)
| westnorth =  
| westnorth =  
| north =  
| north =  
| northeast = [[AQA Room 79600]]
| northeast = [[Triple Gate Room]]
| eastnorth =  
| eastnorth =  
| westupper =  
| westupper =  
Line 9: Line 9:
| eastupper =  
| eastupper =  
| east =  
| east =  
| southwest = Thru Broken Wall: [[AQA Room 79C00]] (North East Broken Wall)
| southwest = Thru Broken Wall: [[AQA Security Room North Access]] (North East Broken Wall)
| westsouth =  
| westsouth =  
| south =  
| south =  
| southeast =  
| southeast = [[Construction Site Checkpoint]]
| eastsouth =  
| eastsouth =  
}}
}}

Latest revision as of 15:13, 15 August 2025

Construction Site (South East)
Triple Gate Room
Current Room
Thru Broken Wall: AQA Security Room North Access (North East Broken Wall)
Construction Site Checkpoint

Sector: Sector 4 (AQA)

All Categories

Items

  • None